  • You get early cost input from the contractor. A price is put on conceptual design ideas as they are developed.
  • A GUARANTEED MAXIMUM PRICE can be determined early, right after the scope of the project is established.
  • Time can be saved because construction can begin before the design is completed. Example: architect could be completing interior designs while the site and foundation work is underway. This technique is called FAST TRACKING.
  • The need for high cost change orders is eliminated.
  • Architectural and engineering fees are kept to a minimum, and determined from the beginning.
  • Contractor fees are kept to a minimum, and determined from the beginning.
  • Legal fees are kept to a minimum by eliminating the adversary roles.
  • Construction costs are minimized by using the latest systems and methods that the contractor KNOWS are effective.
  • Chances for misunderstandings are minimized with the team approach.
  • You get the best ideas from your team members due to the cooperative team spirit.
  • Realistic completion dates are established by the contractor who will do the work.

Please call 864-269-8900 to obtain past Design/Build references

Cely specializes in Design/Build